Kaleshwaram project 5th Link & package No =?
Konda Pochamma Reservoir Capacity Height & Plan
618 meters height (largest in the project medigadda 100M , 500 Meters to uphill)
Mid manair >>Siddipet Ananthagiri reservoir>> tunnel,open canal, >>ranganayaka sagar >>mallanna>>konda pochamma>>
Ranganayaka sagar 1.10 lakh acres
50 tmc capacity Mallanna sagar (nalgonda, nizamabad) to konda pochamma by 18km
0.6tmc.
6pumps @ 40mw * maybe 1250cusec
2 lift ( cost of 2100 cr)
1250 cusec pumps *24 hours 25 days to complete,
15 tmc capacity
1700 cr power bill to fill the konda pochamma sagar.
2.85 -3 lakh acre irritation by gravity & Hyderabad water.
How Many times Konda Pochamma Water Lifted?
Link 1 3 Times
link 2 1 time
Link 4 4 times
8 Times
Lifting 1 TMC cost one time 6.1cr
6.1 * 8 = 48.8 (50cr)
Litre cost if 10 times lifted 48 litres for 1 rupee. (calculated on kaleshwaram project page)
1 TMC required to Irrigate 6000 Acres
If we distribute 50 Cr to 6000 Acres then 1 acre will get 83 Thousand rupees for year.
500000000/6000= 83, 333 (konda pochamma water mostly used for 30TMC for Hyderabad drinking)
Districts benefited under Konda Pochamma Reservoir
5 district
Siddipet,medak,yadadri,bhuvanagiri, medchal Malkangiri,
4,2000 acres land acquisition
Gayatri pumphouse 3140 139mw= 1 district
1540 vela kotlu.
Reservoir size 15.8 km shape circular /valyakaram
Kondapachmma sagar 3 gates
Sangareddy canal >>Sangareddy, Siddipet a,medak,
Jagdevpur canal >> yadari
Medchal shameerpet lo keshavpur reservoir to Hyderabad water.
Raw water 2 pipelines bommarajupet water treatment plan(102 million gallan raw water capacity)
1250 cusecs capacity * 24 hours * 25 tmc
1250 check dams by 4000cr to prevent water go to Godavari again.
Mallanna sagar to markuk pumphouses 28 km distance
11500 cusec canal,
Kcr speech on Konda Pochamma Inguarion
There are kids at Kodakandla village swimming ganda mallamma canal, if pumphouse starts they will come along with flow
and float in konda pochamma. so he requested media make awareness to reduce accidents and also requested collector to build ghats to bath.
I request all journalist don;t questions on this holiday, there is nayagara scene appearing if anyone interested go and watch 2nd time.
submerged villages
Bailampur, Thanedarpally and Mamidyal 12 lakh for acre and double bed-room houses.
About kaleshwaram project
Total power
4800 mega watts
10,000 cr current bill paid by govt
400kv substations 6
220kv sub station s 7
120 kv 2
521 new lanes
125+40TMC in barrage (new reservoir in ts in 4 years)
Dummugudem seetamma sagar 35TMC
Sammakka sagar 7.5TMC
Annapurna surgepool
106mw. 2800 cusec
4 motors 1 day TMC
Gayatri pumphouse
139 mw
Total pump houses in kaleshwaram 20 as on date
-
Medigadda Kannepalli /laxmi pumphouse
2 .Annaram /Saraswati pump house
Sundilla dam/ golivada Parvathi pumphouse
2nd link
Medaram / Nandi pumphouse
8th
Laxmipur/ Gayatri pumphouse
anantagiri /Annapurna pumphouse
ranganayak sagar, mallanna sagar, kondapochamma
3.
Markuk
6 pumps 40mw capacity
Annapurna surgepool
4 pumps 106mw 2800 cusecs
106mw
Gayatri pumphouse
139 mw 3140cusec = 3 lack acres
Nandi pumphouse
Sundilla / Parvathi pumphouse to yellampalli