tsspdcl slab rates domestic Telangana electricity bill tariff monthly tariff charges calculation. view the tsspdcl tariff charges chart.
tsspdcl districts: 15 districts viz., Mahabubnagar , Narayanpet, Nalgonda , YadadriBhuvanagiri , Suryapet , Siddipet , Medchal , Wanaparthy , Nagarkarnool , Jogulamba Gadwal , SangaReddy , Medak , Hyderabad , Vikarabad and Rangareddy
tsnpdcl districts: 8 districts: Mancherial, Nirmal, Kumram Bheem, Kamareddy, Peddapalli, Jagtial, Rajanna, Warangal, Hanumakonda, Mahabubabad, Mulugu, Prof Jayashankar, Jangaon, Bhadradri Kothagudem, Adilabad, Nizamabad, Karimnagar and Khammam districts.
TSSPDCL Slab rates fy 2023-24
tsspdcl unit charges 2023 domestic
note: from feb 2024 zero cost below 200 units for white ration card holders..
Slab rate consumption | 1 unit cost | total cost |
up to 100 units per month | ||
1st 50 units cost | 1.95 rupees | 1.95*50=97.5 |
51-100 units | 3.10 rupees | 3.10*50=155 |
Sample: 95 units usage per month then
upto = 1.95*50=97.5 3.10*45=139.5 + energy charges 20+ |
||
Above 100 units & below 200 units | ||
0-100 units | 3.40 | 3.40*100=340rupees |
101-200 | 4.80 | 100*4.80=480 rupees |
Sample calculation: 190 units or below 200 units free for bpl card holders
upto 100 units 3.40*100=340rupees and 90 units 90*4.80=432 total 340+432=772 or 340+480=upto 820 rupess free for bpl card holders as per revanth congress scheme. |
||
Retail Supply Tariff Order & Cross Subsidy Surcharge Order for FY 2023-24
slab based rates for unit.
Average unit cost 5 rupees for unit.. (200 above units consumption in a month. ) 201*5.10=1025 rupees
In you consume below 200 units month
up to 100*3.40=340
100-200units 100*4.80=480
340+480=820
Year wise Telangana electricity slab increase for bill
Year | unit cost for above 200 | 100-200 units | up to 100 |
FY 2023-24 | 5.10 inr | 4.80 | 3.40 |
FY 2022 -23 | 5.10 inr | 4.80 | 3.40 |
FY 2018-19 | 5 | 4.30 | 3.30 |
Retail Supply Tariff Order & Cross Subsidy Surcharge Order for FY 2023-24 pdf
https://www.tssouthernpower.com/tariffschedule
tsnpdcl slab rates domestic 2021
- 1-50 Units – 1.45 Rupees
- 51-100 units
1st 50 units at 1.45 and remaining 51-100 at 2.6.
- 1-50 units at 2.6
- 51-100 Units at 2.6
- 101-150 at 3.6
- 151 -200 at 3.6 rupees.
- Up to 50 units at 2.6
- 51-100 > 3.28
- 101-150 >> 4.88
- 151-200 >>5.63
- 201-250 >> 6.38
- 251-300>>6.68
- 301-400 >> 7.38
- 401-500 >> 7.68
- Above 500 8.38
Related How to calculate electricity bill
as on
20 Feb 2020
- From 0-50 units, Rs 1.45
- 51-100, Rs 2.6 per unit.
- From 101-200, Rs 4.3 per unit,
- from 201-300 Rs 7.2 per unit,
- from 301-400 Rs 8.5,
- from 401-800 Rs 9 and
- above 800 units, Rs 9.5 per unit is charged.
No hike from 208-19
Telangana electricity Tariff Schedule for pdf
TSNPDCL – 2 Months
248 Units Days 63
Average: 122.03
3.6*248= 892 (this calculation is wrong)
124 units per month
1-50 units at 2.6 50*2.6=130
51-100 Units at 50*2.6 = 130
101-150 at 3.6
24*3.6=86.4
130+130+86.4=346.4
Average:
346.4+346.4= 692
Energy charges = 50 +50
892
RETAIL SUPPLY TARIFF SCHEDULE FOR FY 2018-19 (RETAIL SUPPLY TARIFF RATES AND TERMS AND CONDITIONS)
(Applicable with effect from 01.04.2018 to 31.03.2019 in respect of the two Distribution Licensees (TSSPDCL & TSNPDCL) in the State of Telangana and the Rural Electricity Supply Co-operative Society, Siricilla in the State)
Category |
Fixed/Demand Charge (Rs./Month) |
Energy Charge |
|
Unit |
Rate |
(Rs./kWh or Rs./kVAh) |
|
Low Tension |
|||
LT I: Domestic |
|||
LT I (A): Upto 100 Units/Month |
|||
0-50 |
1.45 |
||
51-100 |
2.60 |
||
LT I (B)(i):Above 100 Units/Month & up to 200 Units/Month |
|||
0-100 |
3.30 |
||
101-200 |
4.30 |
||
LT I (B)(ii): Above 200 Units/Month |
|||
0-200 |
5.00 |
||
201-300 |
7.20 |
||
301-400 |
8.50 |
||
401-800 |
9.00 |
||
Above 800 units |
9.50 |
||
LT II: Non-Domestic/Commercial |
|||
LT II (A): Upto 50 Units/Month |
|||
0-50 |
kW |
50 |
6.00 |
LT II (B): Above 50 Units/Month |
|||
0-100 |
kW |
60 |
7.50 |
101-300 |
kW |
60 |
8.90 |
301-500 |
kW |
60 |
9.40 |
Above 500 |
kW |
60 |
10.00 |
LT II (C): Advertisement Hoardings |
kW |
60 |
12.00 |
LT II (D): Haircutting salons consuming upto 200 units/month |
|||
0-50 |
kW |
60 |
5.30 |
51-100 |
kW |
60 |
6.60 |
101-200 |
kW |
60 |
7.50 |
LT III: Industry |
|||
Industries |
kW |
60 |
6.70 |
Seasonal Industries (off-season) |
kW |
60 |
7.40 |
Pisciculture/Prawn culture |
kW |
21 |
5.20 |
Sugarcane crushing |
kW |
21 |
5.20 |
Poultry farms |
kW |
50 |
6.00 |
Mushroom, Rabbit, Sheep and Goat farms |
kW |
60 |
6.30 |
LT IV: Cottage Industries |
3 1
Category |
Fixed/Demand Charge (Rs./Month) |
Energy Charge |
|
Unit |
Rate |
(Rs./kWh or Rs./kVAh) |
|
LT IV(A): Cottage Industries |
kW |
20/kW subject to a minimum of Rs.30/month |
4.00 |
LT IV(B): Agro Based Activities |
kW |
20/kW subject to a minimum of Rs.30/month |
4.00 |
LT V: Agriculture |
|||
LT V (A): Agriculture (DSM Measures mandatory) |
|||
Corporate Farmers |
HP |
2.50 |
|
Other than Corporate Farmers |
HP |
0.00 |
|
LT V (B): Others |
|||
Horticulture Nurseries with CL upto 15 HP |
HP |
20 |
4.00 |
LT VI: Street Lighting & PWS |
|||
LT VI (A): Street Lighting |
|||
Panchayats |
kW |
32 |
6.10 |
Municipalities |
kW |
32 |
6.60 |
Municipal Corporations |
kW |
32 |
7.10 |
LT VI (B): PWS Schemes |
|||
Panchayats |
HP |
32/HP subject to a minimum of Rs.50/month |
5.00 |
Municipalities |
HP |
32/HP subject to a minimum of Rs.100/month |
6.10 |
Municipal Corporations |
HP |
32/HP subject to a minimum of Rs.100/month |
6.60 |
LT VII: General |
|||
LT VII (A): General Purpose |
kW |
21 |
7.30 |
LT VII (B): Wholly Religious Places |
|||
Load upto 2 kW |
kW |
21 |
5.40 |
Load above 2 kW |
kW |
21 |
6.00 |
LT VIII: Temporary Supply |
kW |
21 |
11.00 |
High Tension |
|||
HT I(A): Industry General |
|||
11 kV |
kVA |
390 |
6.65 |
33 kV |
kVA |
390 |
6.15 |
132 kV and above |
kVA |
390 |
5.65 |
HT I(A):Lights and Fans |
|||
11 kV |
6.65 |
||
33 kV |
6.15 |
||
132 kV and above |
5.65 |
||
HT I(A):Poultry Farms |
|||
11 kV |
kVA |
390 |
6.65 |
33 kV |
kVA |
390 |
6.15 |
HT I(A):Industrial Colonies |
|||
11 kV |
6.30 |
||
33 kV |
6.30 |
4
2
Category |
Fixed/Demand Charge (Rs./Month) |
Energy Charge |
|
Unit |
Rate |
(Rs./kWh or Rs./kVAh) |
|
132 kV and above |
6.30 |
||
HT I(A):Seasonal Industries |
|||
11 kV |
kVA |
390 |
7.60 |
33 kV |
kVA |
390 |
6.90 |
132 kV and above |
kVA |
390 |
6.70 |
HT I(A):Optional Category with Load Up to 150 kVA |
|||
11 kV |
kVA |
80 |
7.00 |
HT I: Time of Day Tariffs (6 AM to 10 AM) |
|||
11 kV |
7.65 |
||
33 kV |
7.15 |
||
132 kV and above |
6.65 |
||
HT I: Time of Day Tariffs (6 PM to 10 PM) |
|||
11 kV |
7.65 |
||
33 kV |
7.15 |
||
132 kV and above |
6.65 |
||
HT I: Time of Day Tariffs (10 PM to 6 AM) |
|||
11 kV |
5.65 |
||
33 kV |
5.15 |
||
132 kV and above |
4.65 |
||
HT I (A): Poultry Farms – Time of Day Tariffs (6 AM to 10 AM) |
|||
11 kV |
7.65 |
||
33 kV |
7.15 |
||
HT I (A): Poultry Farms – Time of Day Tariffs (6 PM to 10 PM) |
|||
11 kV |
7.65 |
||
33 kV |
7.15 |
||
HT I (A): Poultry Farms – Time of Day Tariffs (10 PM to 6 AM) |
|||
11 kV |
5.65 |
||
33 kV |
5.15 |
||
HT I(B):Ferro Alloy Units |
|||
11 kV |
5.90 |
||
33 kV |
5.50 |
||
132 kV and above |
5.00 |
||
HT II OTHERS |
|||
11 kV |
kVA |
390 |
7.80 |
33 kV |
kVA |
390 |
7.00 |
132 kV and above |
kVA |
390 |
6.80 |
HT II: Time of Day Tariffs (6 AM to 10 AM) |
|||
11 kV |
8.80 |
||
33 kV |
8.00 |
||
132 kV and above |
7.80 |
||
HT II: Time of Day Tariffs (6 PM to 10 PM) |
|||
11 kV |
8.80 |
||
33 kV |
8.00 |
||
132 kV and above |
7.80 |
||
HT II: Time of Day Tariffs (10 PM to 6 AM) |
|||
11 kV |
6.80 |
||
33 kV |
6.00 |
||
132 kV and above |
5.80 |
5 3
Category |
Fixed/Demand Charge (Rs./Month) |
Energy Charge |
|
Unit |
Rate |
(Rs./kWh or Rs./kVAh) |
|
HT III AIRPORTS, BUS STATIONS AND RAILWAY STATIONS |
|||
11 kV |
kVA |
390 |
7.50 |
33 kV |
kVA |
390 |
6.85 |
132 kV and above |
kVA |
390 |
6.45 |
HT III: Time of Day Tariffs (6 AM to 10 AM) |
|||
11 kV |
8.50 |
||
33 kV |
7.85 |
||
132 kV and above |
7.45 |
||
HT III: Time of Day Tariffs (6 PM to 10 PM) |
|||
11 kV |
8.50 |
||
33 kV |
7.85 |
||
132 kV and above |
7.45 |
||
HT III: Time of Day Tariffs (10 PM to 6 AM) |
|||
11 kV |
6.50 |
||
33 kV |
5.85 |
||
132 kV and above |
5.45 |
||
HT IV (A) Irrigation & Agriculture |
|||
11 kV |
kVA |
165 |
5.80 |
33 kV |
kVA |
165 |
5.80 |
132 kV and above |
kVA |
165 |
5.80 |
HT IV(B) CP Water Supply Schemes |
|||
11 kV |
5.10 |
||
33 kV |
5.10 |
||
132 kV and above |
5.10 |
||
HT V (A) Railway Traction |
kVA |
390 |
4.05 |
HT V (B) Hyderabad Metro Rail (HMR) |
kVA |
390 |
3.95 |
HT VI Townships & Residential Colonies |
|||
11 kV |
kVA |
60 |
6.30 |
33 kV |
kVA |
60 |
6.30 |
132 kV and above |
kVA |
60 |
6.30 |
HT VII: Temporary |
|||
11 kV |
kVA |
500 |
10.80 |
33 kV |
kVA |
500 |
10.00 |
132 kV and above |
kVA |
500 |
9.80 |
HT VIII: RESCO |
|||
11 kV |
4.52 |
Terms and Conditions
- Fuel Surcharge Adjustment (FSA) is applicable in accordance with the provisions of the Electricity Act, 2003.
- The tariffs are exclusive of Electricity Duty payable as per the provisions of the AP Electricity Duty Act as adopted by the Government of Telangana State.
-
Voltage surcharge: The voltage surcharge withdrawal stands continued even for FY 2018-19.
-
Additional charges for maximum demand exceeding the contracted demand
6
4
In case, in any month the Recorded Maximum Demand (RMD) of the consumer exceeds his Contracted Demand with the Licensee, the consumer shall pay the following charges on excess demand recorded and on the entire energy consumed.
RMD over CMD
Demand charges on excess demand
Energy charges on full energy
100 to 120%
2 times of normal charge
Normal
Above 120% and up to 200%
2 times of normal charge
1.15 times of normal charge
More than 200%
2 times of normal charge
1.20 times of normal charge
In case of HT V(A) and HT V(B): Railway Traction and HMR, the energy charges shall be computed at 1.05 times of normal charges on the entire consumption, if RMD exceeds 120% of Contracted Demand.
-
Minimum charges
Category
LT categories
Rates for FY 2018-19
LT I(A)
Domestic
Contracted Load of 1000 Watts and below
Single Phase
Rs. 25/month
LT I(B)(i)
Contracted Load of above 1000 Watts
Single Phase
Rs. 50/month
LT I(B)(ii)
Three Phase
Rs. 150/month
LT II(A) & II(B)
Non-Domestic / Commercial
Single Phase
Rs. 65/month
Three Phase
Rs. 200/month
LT II(C)
Advertisement Hoardings
Rs. 300/month
LT II(D)
Single Phase
Rs. 65/month
Three Phase
Rs. 200/month
LT VI(A)
Street Lighting
Panchayats
Rs. 2/point/month
Municipalities and Municipal Corporations
Rs. 6/point/month
LT VII(A)
General Purpose
Single Phase
Rs. 50/month
Three Phase
Rs. 150/month
LT VIII
Temporary Supply
Rs. 125 per kW or part thereof of the contracted load for first 30 days or part thereof and for every subsequent period of 15 days or part thereof a charge of Rs. 75 per kW.
HT Categories
Rates for FY 2018-19
Billing Demand
Billing Demand shall be maximum demand recorded during the month or 80% of the contracted demand whichever is higher except HT IV(A) and HT VI
For HT IV(A) (Lift Irrigation), during the operational months July to November, Billing Demand shall be maximum demand recorded during the month or 80% of the contracted demand whichever is higher and,
during the non-operational months December to June, Billing Demand shall be maximum demand recorded during the month or 20% of the contracted demand whichever is higher
For HT VI (Township and Residential Colonies), the billing demand is Actual Demand Recorded)
Minimum Energy Charges
Rates for FY 2018-19
HT I(A)
Industry-General
50 kVAh per kVA of billing demand per month
HT I(B)
Ferro Alloy units
Maximum Demand or Average Actual Demand whichever is higher. The energy falling short of 6,701 kVAh per kVA per annum will be billed as deemed consumption. This shall be calculated on an annual basis and not on a monthly
basis and disconnection periods shall be exempted while computing the minimum off-take
HT II
Others
25 kVAh per kVA of billing demand per month
7
5
HT III
Airports, Bus Stations and Railway Stations
50 kVAh per kVA of billing demand per month
HT V(A) & V(B)
Railway Traction & HMR
32 kVAh per kVA of Contracted Demand per month
HT VI
Townships &
Residential Colonies
Billing Demand shall be Actual Recorded Demand.
25 kVAh per kVA of contracted demand per month.
-
Customer charges
Consumer Category
Rs./month
Low Tension
LT I: Domestic (Units/month)
0-50
Rs. 25
51-100
Rs. 30
101-200
Rs. 50
201-300
Rs. 60
301-400
Rs. 80
401-800
Rs. 80
Above 800 units
Rs. 80
LT II (A&B):Non-Domestic/ Commercial (Units/month)
0-50
Rs. 45
51-100
Rs. 55
101-300
Rs. 65
301-500
Rs. 65
Above 500 units
Rs. 65
LT II(C): Advertisement Hoardings
Rs. 70
LT II(D): Haircutting Salons with consumption upto 200 units per month
0-50
Rs. 45
51-100
Rs. 55
101-200
Rs. 65
LT III: Industry up to 20 HP
Rs. 75
LT III: Industry 21-50 HP
Rs. 300
LT III: Industry 51-100 HP
Rs. 1125
LT IV: Cottage Industries
Rs. 45
LT V: Agriculture
Rs. 30
LT VI: Street Lighting & PWS
Rs. 50
LT VII: General Purpose
Rs. 60
LT VIII: Temporary Supply
Rs. 65
High Tension
HT consumers at 11 kV
Rs. 1685
HT consumers at 33 kV
Rs. 1685
HT consumers at 132 kV and above
Rs. 3370
-
Delayed Payment Surcharge (DPS)
LT Category
- In case of LT I(A), LT I(B), LT II(A), LT II(D), LT IV and LT V(B), if payment is made after due date, the consumers are liable to pay, Delayed Payment Surcharge (DPS) per month on the bill amount at the rates given in table below:
LT I(A)
Rs. 10 per month
LT I(B), LT II(A), LT II(D), LT IV and LT V(B)
Rs. 25 per month
- In case of LT II(B), LT II(C), LT III, LT VI, and LT VII, the Licensee shall levy Delayed Payment Surcharge (DPS) on the bill amount at the rate of 5 paise/ Rs. 100/ day calculated from the due
8
6
date mentioned on the bill, up to the date of payment or Rs. 150 whichever is higher. In case of grant of installments, the Licensees shall levy interest at the rate of 18% per annum on the outstanding amounts compounded annually and the two (DPS and interest) shall not be levied at the same time.
HT Category
a) The Licensees shall charge the Delayed Payment Surcharge (DPS) per month on the bill amount at the rate of 5 paise/ Rs. 100/ day or Rs. 550 whichever is higher. In case of grant of installments, the Licensee shall levy interest at the rate of 18% per annum on the outstanding amounts, compounded annually and the two charges shall not be levied at the same time.
- In case of LT I(A), LT I(B), LT II(A), LT II(D), LT IV and LT V(B), if payment is made after due date, the consumers are liable to pay, Delayed Payment Surcharge (DPS) per month on the bill amount at the rates given in table below:
-
Reconnection charges
Low Tension services
LT I(A)
Rs. 25
Overhead LT services
Rs. 75
U.G. services
Rs. 200
High Tension service
11 kV
Rs. 1000
33 kV
Rs. 2000
132 kV and above
Rs. 3000
-
Testing charges
Installation
LT
HT
The first test and inspection of a new installation or of an extension to an existing installation
Nil
Nil
Charges payable by the consumer in advance for each subsequent
test and/or inspection if found necessary owing to any fault in the installation or to non-compliance of the conditions of supply
Rs. 20
Rs. 200
Meter
A.C. Single Phase Energy meter
Rs. 100
A.C. Three Phase Energy meter
Rs. 300
LT Tri Vector meter
Rs. 2000
11 kV
Rs. 3000
33 kV
Rs. 3000
132 kV and above
Rs. 3000
Transformer oil
Each sample of oil
Rs. 150 per sample
-
Supervision / Inspection and checking charges
For LT I(A) Domestic
Rs. 100
For LT I(B) Domestic
Rs. 100
LT Agricultural
Rs. 100
For all other LT Categories
Rs. 100
For all HT Categories
Rs. 600
-
Low power factor charges: For all consumer categories where kVAh billing is done, no Low Power Factor surcharge shall be levied.
-
Capacitor surcharge: LT consumers (except LT I Domestic) having connected loads mentioned in table below shall pay capacitor surcharge (as per rules in vogue) at the rate of 25% of the billed amount, if capacitors are found defunct.
9
7
Category
Connected Load
LT II and LT VII(A)
< 10 kW
LT III and LT VI(B)
< 20 HP
-
Fixed Charges – Seasonal Industries:
LT III: Rs. 50/ HP/ month on 30% contracted load.
HT: Demand Charges – 30% of CMD or recorded demand whichever is higher.
Temporary Supply for LT and HT consumers: Temporary supply can be given initially for a period up to one year as per the tariff applicable under temporary supply category. After the expiry of one year, the consumer is at liberty to seek further extension.
10 8
ANNEXURE 2
Category |
CSS for FY 2018-19 as approved by the Commission |
|
TSSPDCL |
TSNPDCL |
|
HIGH TENSION |
||
HT Category at 11 kV |
||
HT-I Industry Segregated |
1.65 |
1.66 |
HT-II – Others |
2.03 |
1.97 |
HT-III Airports, Railways and Bus stations |
1.80 |
1.77 |
HT -IV Lift Irrigation and agriculture & CPWS |
0.36 |
0.21 |
HT-VI Townships and Residential Colonies |
1.31 |
0.90 |
HT-VII Temporary |
2.76 |
– |
HT Category at 33 kV |
||
HT-I Industry Segregated |
1.46 |
1.44 |
HT-II – Others |
1.76 |
1.78 |
HT -IV Lift Irrigation and agriculture & CPWS |
1.07 |
0.86 |
HT-VI Townships and Residential Colonies |
1.32 |
1.29 |
HT Category at 132 kV |
||
HT-I Industry Segregated |
1.30 |
1.31 |
HT-II – Others |
1.69 |
3.55 |
HT-III Airports, Railways and Bus stations |
1.49 |
– |
HT -IV Lift Irrigation and agriculture & CPWS |
1.24 |
1.27 |
HT-V Railway Traction & HMR |
1.27 |
1.05 |
HT-VI Townships and Residential Colonies |
– |
1.28 |
The Commission approved the Additional Surcharge of Rs. 0.52/kWh for FY 201819.
Faqs on Telangana electricity tariff charges
is tsnpdcl and tsspdcl tariff charges are same?